Reporting - Change ordering of Account Type on Trial Balance when grouped
Can you please add a profit and loss formula / row in the trial balance report or create a new trial balance report that includes the profit or loss for each selected period.
-
Petrus Mynhardt
commented
Can an edit function be added to the Trial Balance in order to change the layout? The default layout of P&L and B/S in this report does not make any sense and needs to be customizable.
-
Steve MInotakis
commented
The trial balance report column sizes should be customizable.
-
Angela Monti
commented
The current order on the new TB report is not very logical. We really need to be able to change the order of the rows. Why can’t it be a similar format to the old TB?
-
Gabriele Iacono
commented
Can there please be an option for the new trial balance report to group up account types in the following order:
Revenue
Expenses
Assets
Liabilities
EquityNoting that it currently groups the items but in A-Z which is difficult to run through.
-
Natalie Pidwell
commented
Can the New TB report have the option to display by the following account types
Revenue/Expenses/Assets/Liabilities/Equity
-
Johan Alberts
commented
Xero team - I, once again, kindly request an answer on this matter please.
-
Malcolm Greenbaum
commented
I would like to remove the account type and comparison to previous day columns from the basic report.
-
Steven Perich
commented
At least have
1. Options for sorting the GL lines
2. Ability to filter between P&L and Balance Sheet GL lines
3. Ability to add formula as needed
4. Ability to add % fields (eg for GM% lines on a report)
These need to be minimum requirements on every report -
Johan Alberts
commented
Any feedback Xero team?
-
Lisa Costello
commented
Yes please!
I'd like to take the TB and rearrange to my own design P&L + B/Sh but need formula rows. I'd like to do this as my client wants to see Equity following on the P&L in management reports. -
Chanita Paulsen
commented
this feature would be helpful
-
Sarah Leonard - MTD Xero Access Xero
commented
Trial Balance in order of the Profit and Loss and then Balance Sheet.
In the new Trail Balance report you can group the nominal codes by Account Type - but it then lists the types alphabetically instead of grouping by Profit and Loss and then Balance Sheet (like the older TB report did by default). Alphabetically listing isn't very useful. Please re-list them in a logical order.